Midland College

Page Content   Main Links   Search Form

Public Information

About MC   Academics   Admissions   Athletics   Continuing Ed   Directories   Facilities   Foundation   Student Life   Student Services   


CONSTRUCTION NOTICE

As part of our Bond improvements, Midland College will be re-piping major parts of its heating and cooling system through early November. As a result, the heat will be turned off to all buildings inside the circle and to Chaparral Center. Please monitor the weather in order to dress appropriately during that period. Sorry for this inconvenience, as we work to make Your College better!

The plan below details the trenching and pipe laying that is taking place on campus now and for the next few months.  Everywhere you see a red line, you can expect an open trench 13' wide and up to 8 feet deep.  There will also be an abundance of heavy digging equipment and welders. Bright orange safety fencing will be used as a barrier around these working areas.

Click image to enlarge Construction

Fast Links

Text Only | Contacts | Policies | Required Links

© 1997-2008 Midland College - 3600 N. Garfield - Midland, TX 79705 - (432) 685-4500

Text Only Options

Top of page


Text Only Options

Open the original version of this page.

     

LIFT Text Transcoder is a UsableNet product. LIFT Text Transcoder Main Page.